Farooq is a CPM Scheduler having 10 years of experience in developing and maintaining schedules associated with planning, permitting, design, procurement, construction, and final closeout activities. Created baseline schedules, incorporated contractors’ schedules, and look-ahead schedules, and integrated project schedules and costs

Project Control Skills
  • Cost and Resource loaded CPM Schedules, Performance Measurement Baseline (PMB) / re-baselining
  • Bidding/Proposal / Contract documents, Estimates, Drawings, and Engineering Specs,
  • Critical Path Analysis, High float management, WBS scheme
  • Maintaining the schedule for tracking time and cost
  • Analysis skills – EVMS for monitoring SPI and CPI and forecasting ETC and EAC
  • Time Impact Analysis, Claim Digger, S-Curve and histogram, schedule diagrams (Pert, Gantt & Time-Scale),
  • Change management and incorporation of Change orders, impact analysis
  • Risk distribution of contingencies, Recovery Schedule, “What-If” Scenarios
  • Conversion of MS Project Schedule to Primavera P6 and vice versa.
Our Services

Project Control Services-Remote

Providing real-time data, accurate pictures of a project’s status, and actionable insights to ensure projects are delivered safely and to the specified quality, schedule, and budget for companies

Trainings- On line

Trainings for Primavera P6 and MS Project
Create detailed schedule and cost loading
Maintenance of schedule over project life cycle
Delay Analysis, EVM, Change Management

Major Industries

  • Multiple industries such as
  • Construction ( Residential and Non-residential constructions )
  • Substations and Towers & Transmission Lines (T&D), Energy and Utility projects
  • Infrastructures (Road, Water Supply, and Sewage System),
  • Oil and Gas

Major Projects

ENERGY Projects

  • Reconfiguration of Lawn side Gas Insulated Switchgear 69 KV Substation NJ USA.
  • Mount Rose 69 KV Substation Air Insulated Switchgear, Reconfiguration of NJ USA
  • Plant Held for Future Use -Mount Rose 69 KV Substation Extension – New Jersey USA.
  • Motts Farms Transmission and Relay Replacement, Upgrade 15 KV Switchgear, NJ, USA
  • Monroe T3 230-138 KV Switchgear using Mobil Unit substation NJ USA
  • Pleasantville –Replace 12KV Switchgear and SGR Exit Feeder Cable Replacement NJ, USA
  • Terrace Substation 69 KV Ring Bus, install SWGR and upgrade XFMRs NJ, USA

DOT Projects

  • Bridge Deck Replacements at Loop Parkway and Meadow Brooke in the Town of Hempstead, NY, USA
  • Rehabilitation of Bayville Bridge, Nassau County NY USA w/ H&L Department of Public Works (DPW) NY
  • Maintenance Cleaning on Various Highways of NYC

CONSTRUCTION Projects

  • Exterior Brick Masonry, Windows, Parapet, Roof waterproofing, interior works at Public School 32 Bronx New York USA
  • PS 94 Brooklyn-Exterior Masonry, Windows and Roof Replacement with SCA
  • PS29 Bronx Exterior Masonry/Windows/Parapets New York USA

BUILDING Projects

  • Construction of Duct Banks for Oil and Gas facility project, in Calgary Canada
  • Delay analysis for Residential Construction in Calgary, Canada
  • Construction of 5 Schools – Royal Commission of Jubail Saudi Arabia Cost $32 Million.
  • Construction of Utility Mains and Security -Cost $54 Million

Testimonials

Engineering Manager

Alice Howard

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Interior Designer

Nathan Marshall

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Architect

Ema Romero

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Manager

Ann Smith

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Request a Quote

Ready to Work Together? Build a project with us!

Learn More From

Frequently Asked Questions

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Scroll to Top